Delayed Payments in SA Construction: How to Protect Your Cash Flow

Wakha Team 18 metsotso go buisa
Delayed Payments in SA Construction: How to Protect Your Cash Flow

Late payments destroy South African construction businesses. Not poor workmanship. Not rising material costs. Not even load shedding — though it doesn’t help. The single biggest reason contractors fail is clients who don’t pay on time, leaving you funding projects from your own pocket while waiting 60, 90, or even 120 days for payment.

In South Africa’s construction industry, delayed payments aren’t occasional inconveniences — they’re endemic. Payment cycles of 60–90 days are standard, even when contracts specify 30-day terms. Retentions tie up 5–10% of your contract value for months or years. And when disputes arise over work quality or variations, payments can stop entirely, leaving you without cash to pay subcontractors, suppliers, or your own team.

This guide explains how to protect your construction business from delayed payments. We’ll cover the scale of the problem, your legal rights under South African construction contracts, what causes late payments, how to prevent them, what to do when payments are late, and how construction management software can help you get paid faster.

The Scale of the Problem: Late Payments in South African Construction

Delayed payments are a systemic issue in South Africa’s construction industry. According to industry research, the average payment period for construction work in South Africa is 60–90 days, despite most contracts specifying 30-day payment terms. This payment gap creates a cash flow crisis for contractors who must fund materials, labour, and overhead costs upfront.

The 60–90 Day Payment Cycle

Most South African construction contracts operate on a 30-day payment cycle from certificate to payment. But here’s the reality: you complete work in Week 1, submit your payment certificate in Week 2, wait for approval in Week 3, invoice in Week 4, and finally receive payment 30 days after invoicing — if you’re lucky.

That’s 60–90 days from when you spend money on materials and labour to when you receive payment. During that gap, you’re funding the project from your own working capital. For contractors managing multiple projects, this multiplies — three R2 million projects mean you might need R2–R2.5 million in working capital just to bridge the cash flow gap.

The Retention Problem

Retentions compound the delayed payment problem. Most South African construction contracts include retention clauses — typically 5–10% of each payment certificate is held back until practical completion, and sometimes until the end of the defects liability period (usually 12 months).

On a R5 million project with 10% retention, that’s R500,000 tied up for potentially 18–24 months. That money isn’t earning interest for you — it’s sitting in the client’s account while you’ve already spent it on materials and labour. And if practical completion is delayed, retention release is delayed too, extending your cash flow gap.

The Dispute Delay

When disputes arise over work quality, variations, or payment certificates, payments can stop entirely. Clients use disputes as leverage to delay payment, leaving you without cash while you resolve the issue. Even when disputes are resolved in your favour, the delay has already damaged your cash flow.

South African construction contracts provide legal protection against delayed payments, but only if you understand your rights and enforce them. The Construction Industry Development Board (CIDB), JBCC contracts, NEC contracts, and GCC contracts all include provisions for payment terms, interest on late payments, and dispute resolution.

CIDB Best Practice Guidelines on Payment

The Construction Industry Development Board (CIDB) has published best practice guidelines on payment terms and late payment interest. While not legally binding, these guidelines set industry standards and give you leverage when clients delay payment.

CIDB payment guidelines:

  • Payment should be made within 30 days of invoice
  • Late payment interest should be charged at prime rate plus 2%
  • Disputes should be resolved promptly to avoid payment delays
  • Payment certificates should be issued within contract deadlines
  • Retention should be released promptly at practical and final completion

Reference these guidelines in your contracts and invoices. They give you leverage when clients delay payment and demonstrate that your expectations are aligned with industry standards.

JBCC Payment Timelines and Interest Provisions

The JBCC (Joint Building Contracts Committee) contract forms are widely used in South African construction. Under JBCC PBA 2018, payment certificates must be issued within 7–14 days of receiving the contractor’s claim, and payment must be made within 14 days of certificate issuance.

JBCC payment terms:

  • Contractor submits payment claim by specified date (typically 25th of month)
  • Principal agent issues certificate within 7–14 days
  • Employer pays within 14 days of certificate date
  • Late payment interest at prime rate plus 2% (if contract provides)

JBCC contracts also include interest clauses for late payments. If payment is not made by the due date, you’re entitled to interest at the rate specified in the contract (typically prime rate plus 2%). This interest accumulates daily until payment is received.

NEC Payment Provisions

NEC (New Engineering Contract) contracts are increasingly used in South African construction, particularly for infrastructure projects. NEC contracts include strict payment timelines and interest provisions.

NEC payment terms:

  • Payment certificates issued at specified intervals (typically monthly)
  • Payment due within specified period (typically 14 days)
  • Late payment interest at specified rate
  • Dispute resolution through adjudication

NEC contracts also include provisions for suspending work if payment is not received, giving you leverage when clients delay payment.

GCC Payment Terms

GCC (General Conditions of Contract) contracts are commonly used for government and public sector projects. GCC contracts include payment terms and interest provisions similar to JBCC contracts.

GCC payment terms:

  • Payment certificates issued monthly
  • Payment due within 30 days of certificate
  • Late payment interest at prime rate plus 2%
  • Dispute resolution through arbitration

Understanding your contract’s payment terms is essential. If your contract specifies 30-day payment terms but you’re waiting 90 days, you have legal grounds to claim interest and escalate the matter.

Causes of Late Payments: Why Clients Don’t Pay on Time

Understanding why clients delay payment helps you prevent the problem. Common causes include disputes over work quality, administrative delays, client cash flow problems, and complex approval chains.

Dispute Over Work Quality

Clients often delay payment when they dispute work quality, claiming that work doesn’t meet specifications or that defects need to be rectified before payment. While some disputes are legitimate, others are used as leverage to delay payment or negotiate lower prices.

Preventing quality disputes:

  • Document work thoroughly with photos and site diaries
  • Get written approval for variations before executing work
  • Address defects promptly when identified
  • Maintain clear communication with the principal agent
  • Submit detailed payment certificates with supporting documentation

Quality disputes are easier to prevent than to resolve. By documenting work thoroughly and maintaining clear communication, you reduce the likelihood of disputes that delay payment.

Administrative Delays

Administrative delays are a common cause of late payments. Clients may delay payment certificates due to:

  • Principal agent workload or unavailability
  • Complex approval chains requiring multiple sign-offs
  • Incomplete or unclear payment certificates
  • Missing documentation or supporting evidence
  • Internal processing delays

Preventing administrative delays:

  • Submit payment certificates on time, every time
  • Include all required documentation and supporting evidence
  • Use clear, professional certificate formats
  • Follow up proactively before deadlines
  • Build relationships with principal agents and client administrators

Administrative delays are often preventable. By submitting complete, professional payment certificates on time and following up proactively, you reduce the likelihood of delays.

Client Cash Flow Problems

Clients may delay payment because they don’t have cash available. This is particularly common with:

  • Property developers waiting for sales or financing
  • Government departments with budget constraints
  • Companies experiencing financial difficulties
  • Projects where client funding is delayed

Protecting against client cash flow problems:

  • Check client creditworthiness before accepting contracts
  • Negotiate upfront payments or shorter payment cycles for high-risk clients
  • Monitor client payment history and follow up early
  • Consider payment guarantees or bonds for high-value projects
  • Factor payment risk into pricing

Client cash flow problems are harder to prevent, but you can protect yourself by checking creditworthiness, negotiating better terms, and factoring payment risk into pricing.

Complex Approval Chains

Large organisations often have complex approval chains requiring multiple sign-offs before payment. This can delay payments even when there are no disputes or cash flow problems.

Managing complex approval chains:

  • Understand the client’s approval process upfront
  • Build relationships with key decision-makers
  • Submit payment certificates well before deadlines
  • Follow up proactively at each approval stage
  • Consider shorter payment cycles or upfront payments for complex clients

Complex approval chains require proactive management. By understanding the process and building relationships, you can reduce delays.

Impact on Contractors: The Real Cost of Delayed Payments

Delayed payments don’t just inconvenience contractors — they create cash flow crises that can destroy businesses. When payments are delayed, contractors struggle to pay subcontractors, suppliers, and their own teams, leading to project abandonment, damaged relationships, and business failure.

Cash Flow Crisis

When payments are delayed, contractors face immediate cash flow problems. You’ve spent money on materials and labour, but you haven’t received payment. This creates a cash flow gap that must be funded from working capital or external financing.

The cash flow impact:

  • Reduced working capital available for other projects
  • Increased reliance on overdrafts or loans
  • Higher financing costs
  • Reduced ability to take on new work
  • Potential business failure if cash runs out

For contractors managing multiple projects, delayed payments on one project can impact cash flow across the entire business, making it difficult to pay subcontractors or suppliers on other projects.

Inability to Pay Subcontractors

When you don’t get paid, you can’t pay your subcontractors. This creates a cascade of problems:

  • Subcontractors stop work or threaten to stop work
  • Relationships with subcontractors deteriorate
  • You may face legal action from subcontractors
  • Your reputation in the industry suffers
  • Future subcontractors may refuse to work with you

Subcontractor payment problems compound the cash flow crisis. You’re caught between clients who don’t pay and subcontractors who expect payment, creating an impossible situation.

Project Abandonment

In extreme cases, delayed payments can force contractors to abandon projects. When cash runs out and payments don’t arrive, contractors may have no choice but to stop work, leaving projects incomplete and facing legal action from clients.

The abandonment spiral:

  • Delayed payments create cash flow crisis
  • Cash flow crisis prevents paying subcontractors and suppliers
  • Subcontractors and suppliers stop work
  • Project progress slows or stops
  • Client delays payment further due to slow progress
  • Contractor abandons project or faces legal action

Project abandonment is the worst-case scenario, but it happens when delayed payments create an unsustainable cash flow position.

Damaged Relationships and Reputation

Delayed payments damage relationships with clients, subcontractors, and suppliers. When you can’t pay subcontractors because clients haven’t paid you, relationships deteriorate. When you’re constantly chasing payments, client relationships suffer. And when word spreads that you’re struggling with cash flow, your reputation in the industry suffers.

The reputation impact:

  • Clients may avoid working with you
  • Subcontractors may refuse to work with you
  • Suppliers may require upfront payment or refuse credit
  • Banks may reduce credit limits or refuse financing
  • Your ability to win new work suffers

Reputation damage is hard to repair. Once word spreads that you’re struggling with cash flow, it can take years to rebuild trust.

Prevention Strategies: How to Avoid Delayed Payments

Preventing delayed payments is easier than dealing with them after they occur. By implementing clear payment terms, proper payment certificate processes, timely interim certificates, and escalation procedures, you can reduce the likelihood of delayed payments.

Clear Payment Terms

Clear payment terms in your contracts are essential. Specify:

  • Payment cycle (typically 30 days from certificate)
  • Payment method (EFT, cheque, etc.)
  • Payment account details
  • Interest rate for late payments (typically prime rate plus 2%)
  • Dispute resolution procedures
  • Retention release dates

Contract terms to include:

  • Payment due date clearly specified
  • Late payment interest rate and calculation method
  • Right to suspend work if payment is not received
  • Dispute resolution procedures
  • Retention release dates and conditions

Clear payment terms give you legal protection when clients delay payment. If your contract specifies 30-day payment terms and payment is 60 days late, you have grounds to claim interest and escalate the matter.

Proper Payment Certificate Process

Proper payment certificate processes ensure certificates are issued on time and include all required information. This reduces the likelihood of administrative delays or disputes.

Payment certificate best practices:

  • Submit payment certificates on time, every time
  • Include detailed breakdowns of work completed
  • Attach supporting documentation (photos, measurements, site diaries)
  • Use clear, professional certificate formats
  • Follow contract-specified formats (JBCC, NEC, GCC)
  • Include variation claims with supporting documentation
  • Track certificate submission and approval dates

Proper payment certificate processes reduce delays by ensuring certificates are complete, accurate, and submitted on time. This minimises the likelihood of administrative delays or disputes that delay payment.

Timely Interim Certificates

Interim payment certificates should be issued monthly (or at contract-specified intervals) throughout the project. Timely certificates keep cash flowing and reduce the cash flow gap.

Interim certificate timing:

  • Submit claims by contract deadline (typically 25th of month)
  • Follow up proactively if certificates aren’t issued on time
  • Track certificate issuance dates and payment dates
  • Escalate if certificates are consistently late
  • Use construction management software to automate certificate generation

Timely interim certificates are critical for cash flow. If certificates are delayed, payments are delayed, creating cash flow problems. By ensuring certificates are issued on time, you maintain cash flow throughout the project.

Escalation Procedures

Have clear escalation procedures for late payments. Don’t wait until payments are 60 days late to take action — escalate early and consistently.

Escalation procedure:

  1. Reminder — Friendly reminder 5 days before payment due date
  2. Follow-up — Formal follow-up on payment due date
  3. Interest notice — Notice of interest charges if payment is 7 days late
  4. Escalation — Escalate to principal agent or client management if payment is 14 days late
  5. Legal action — Consider legal action or suspension of work if payment is 30+ days late

Escalation procedures give you a structured approach to dealing with late payments. By escalating early and consistently, you demonstrate that late payments are unacceptable and encourage clients to pay on time.

What to Do When Payments Are Late: Your Action Plan

When payments are late, you need to act quickly and systematically. Don’t wait — every day of delay costs you money and damages your cash flow. Follow these steps to recover late payments and protect your business.

Step 1: Formal Notice

Send formal written notice to the client and principal agent when payment is late. The notice should:

  • Reference the payment certificate number and date
  • Specify the amount due and payment due date
  • State that payment is overdue
  • Request immediate payment
  • Reference contract payment terms and interest provisions

Formal notice template:

  • Clear subject line: “Overdue Payment — Certificate [Number]”
  • Reference contract and payment certificate
  • Specify amount due and days overdue
  • Request immediate payment
  • Reference interest provisions if payment is significantly late

Formal notice creates a paper trail and demonstrates that you’re taking the matter seriously. It also gives clients an opportunity to pay before you escalate further.

Step 2: Interest Claims

If your contract includes interest provisions, claim interest on late payments. Calculate interest from the payment due date to the date payment is received, at the rate specified in your contract (typically prime rate plus 2%).

Interest calculation:

  • Interest rate: Prime rate plus 2% (or contract-specified rate)
  • Calculation period: From payment due date to payment received date
  • Daily interest: (Amount due × Interest rate) / 365
  • Total interest: Daily interest × Days overdue

Include interest in your follow-up invoices and formal notices. Interest claims demonstrate that late payments have consequences and encourage clients to pay on time.

Step 3: Escalation to Principal Agent or Client Management

If payment remains overdue after formal notice, escalate to the principal agent or client management. Escalation demonstrates that the matter is serious and requires immediate attention.

Escalation approach:

  • Contact principal agent or client management directly
  • Provide written summary of overdue payment
  • Reference contract terms and payment history
  • Request immediate payment or payment plan
  • Threaten suspension of work if contract allows

Escalation often resolves payment issues. When senior management becomes aware of overdue payments, they often prioritise payment to avoid project delays or legal action.

Step 4: Adjudication or Arbitration

If payment disputes persist, consider adjudication or arbitration under your contract’s dispute resolution procedures. Adjudication is faster and less expensive than litigation, making it suitable for payment disputes.

Adjudication process:

  • Submit dispute to adjudicator (if contract provides)
  • Adjudicator makes binding decision (typically within 28 days)
  • Decision is enforceable through courts if necessary
  • Costs are typically shared between parties

Adjudication provides a quick resolution to payment disputes. If your contract includes adjudication provisions, use them when payments are significantly delayed and other approaches have failed.

Step 5: Suspension of Work

If your contract allows, consider suspending work until payment is received. Suspension gives you leverage and demonstrates that late payments are unacceptable.

Suspension considerations:

  • Check contract terms — suspension may require notice or specific conditions
  • Provide written notice of suspension
  • Stop work immediately upon suspension
  • Resume work only when payment is received
  • Document suspension and resumption dates

Suspension is a last resort, but it’s often effective. When clients face project delays due to suspension, they often prioritise payment to resume work.

How Wakha Helps: Automated Payment Protection

Managing payment certificates, tracking payments, and chasing overdue invoices manually is time-consuming and stressful. Wakha Construction & Property Development Management Software automates payment certificate generation, tracks payments in real-time, sends overdue payment alerts, and maintains a complete document trail for disputes.

Automated Payment Certificate Generation

Wakha generates payment certificates automatically based on work completed, variations executed, and contract terms. This speeds up your billing cycle and reduces the likelihood of administrative delays.

Payment certificate automation:

  • JBCC/NEC/GCC compliant certificate formats
  • Automatic calculation of work completed, materials used, variations claimed
  • Automatic retention calculations and tracking
  • Professional certificate format with all required information
  • PDF export for distribution to clients and principal agents

Faster payment certificates mean faster invoicing, which means faster payment. By automating certificate generation, Wakha helps you get paid faster and reduces administrative burden.

Payment Tracking Dashboards

Wakha provides real-time payment tracking dashboards showing payment status across all projects. You can see which payments are due, which are overdue, and which are pending approval.

Payment tracking features:

  • Payment certificate status (submitted, approved, paid)
  • Payment due dates and days overdue
  • Payment history and trends
  • Multi-project payment overview
  • Payment forecasting based on certificate schedule

Payment tracking dashboards give you visibility into your payment status. You can see which payments are overdue and need attention, helping you prioritise follow-up actions.

Overdue Payment Alerts

Wakha sends automatic alerts when payments are overdue, helping you follow up proactively before delays become crises.

Alert system:

  • Alerts 5 days before payment due date
  • Alerts on payment due date
  • Alerts when payment is 7 days overdue
  • Alerts when payment is 14 days overdue
  • Alerts when payment is 30+ days overdue

Overdue payment alerts ensure you never miss a late payment. By alerting you early, Wakha helps you follow up proactively and recover payments faster.

Document Trail for Disputes

Wakha maintains a complete document trail of all payment-related activities, including payment certificates, invoices, reminders, and correspondence. This documentation is essential for disputes and legal action.

Document trail features:

  • All payment certificates stored digitally
  • Payment history with timestamps
  • Reminder and escalation records
  • Email correspondence tracking
  • Supporting documentation (photos, site diaries, variations)

A complete document trail protects you in disputes. When clients claim they didn’t receive invoices or dispute payment terms, you have documentation to prove otherwise.

Payment Certificate Workflow Automation

Wakha automates the entire payment certificate workflow, from work completion to payment receipt. This reduces errors, speeds up the process, and ensures compliance with contract terms.

Workflow automation:

  • Work completion automatically feeds payment certificates
  • Site diary entries support payment claims
  • Variation orders automatically included in certificates
  • Certificate generation with one click
  • Automatic calculation of retentions and previous payments

Workflow automation reduces administrative burden and speeds up payment cycles. By automating the entire process, Wakha helps you get paid faster and reduces the likelihood of delays.

Builder and Developer Plans

Wakha’s payment protection features are available on all plans:

Builder plan (R2,499/month):

  • Basic payment certificate generation
  • Payment tracking and alerts
  • Document storage

Developer plan (R6,999/month):

  • Full payment certificate automation
  • Advanced payment tracking and forecasting
  • Multi-project payment management
  • Variation management and valuation
  • Retention tracking and release date alerts

For contractors managing multiple projects, the Developer plan’s advanced features pay for themselves by helping you avoid cash flow crises and recover payments faster.

Learn more about Wakha’s payment protection features or request a demo to see how it can help you protect your cash flow.

Frequently Asked Questions

What is a reasonable payment period for construction work in South Africa?

Most South African construction contracts specify 30-day payment terms from certificate to payment. However, the industry average is 60–90 days due to administrative delays and disputes. CIDB best practice guidelines recommend 30-day payment terms, and contractors should enforce these terms through contract provisions and proactive follow-up.

Can I charge interest on late payments?

Yes, if your contract includes interest provisions. Most JBCC, NEC, and GCC contracts include interest clauses for late payments, typically at prime rate plus 2%. Calculate interest from the payment due date to the date payment is received, and include it in your follow-up invoices and formal notices.

What should I do if a client disputes a payment certificate?

First, review the dispute carefully. If the dispute is legitimate, address it promptly by providing additional documentation or rectifying defects. If the dispute is unfounded, respond formally with supporting documentation and reference to contract terms. If disputes persist, consider adjudication or arbitration under your contract’s dispute resolution procedures.

How can I prevent delayed payments?

Prevent delayed payments by implementing clear payment terms, proper payment certificate processes, timely interim certificates, and escalation procedures. Submit complete, professional payment certificates on time, follow up proactively before deadlines, and escalate early when payments are late. Construction management software like Wakha can automate certificate generation and payment tracking, reducing the likelihood of delays.

What are my rights if payment is significantly delayed?

If payment is significantly delayed (typically 30+ days), you may have the right to:

  • Charge interest on overdue amounts (if contract provides)
  • Suspend work until payment is received (if contract allows)
  • Pursue adjudication or arbitration under dispute resolution procedures
  • Take legal action to recover payment and interest

Check your contract terms to understand your specific rights and obligations. Always follow contract procedures and seek legal advice if necessary.

Conclusion

Delayed payments are a systemic problem in South Africa’s construction industry, but they don’t have to destroy your business. By understanding your legal rights, implementing prevention strategies, and acting quickly when payments are late, you can protect your cash flow and ensure your business survives.

The key principles are simple: include clear payment terms in your contracts, submit professional payment certificates on time, follow up proactively when payments are late, and escalate early and consistently. But executing these principles across multiple projects requires discipline, systems, and the right tools.

Wakha Construction & Property Development Management Software automates payment certificate generation, tracks payments in real-time, sends overdue payment alerts, and maintains a complete document trail for disputes. With automated workflows and payment protection features, Wakha helps you get paid faster and avoid cash flow crises.

Learn more about Wakha’s payment protection features or contact us to see how it can help you protect your construction business from delayed payments.